The table shows details for the issue number [R012]. If any explanation is required, contact the Parish Council through the enquiry page.
H and W issue number: | R012 |
Type of issue: | p => 1: road damage |
Title: | A51 Poor Surface |
Road: | 5W => London Road N of Crewe Rd |
Location & NGR: | At Boars Head X roads outside New Cottages 1 and 3 SJ 69598 49081 |
Detail: | Very uneven road surface with traffic causing serious property vibration |
Action to be taken or taken: | Road Closure to effect a permanent repair due end Jan 2018, level 2 repair. Update 20/5/18: Road has been repaired to level 2. Surface is still bumpy. To be checked with residents as to whether vibration continues. Update 31/5/18: Resident reports that the problem has not been resolved. Returned to "action required". Reported again on 19/9/2018. Update 07/11/2018: Message from CEC: "All roads and footways on the highway network are regularly inspected as part of our scheduled safety inspection regime. The Noise or Vibration at London Road, Walgherton has been assessed and will be considered for inclusion in an appropriate future programme. At this stage, I am unable to give you any indication on timescale. In the meantime, we will continue to monitor the condition of this location via the scheduled inspection regime, and keep it in a safe condition for all highway users." Update 24/02/2019: no change. Update 18/05/2019: no change - surface remains uneven. Update 13/11/2019: closed for now. Update 24/01/2021: work complete: grade 2 repairs complete in early 2021. |
Date reported to authority: | Reported 2017 and then 19/9/2018 |
Authority's reference and name: | not known and 3338166 |
Response from authority: | Current Status: Placed on future schemes list Last updated: 07/11/2018 - 16:16 Thank you for contacting Cheshire East Highways. All roads and footways on the highway network are regularly inspected as part of our scheduled safety inspection regime.The Noise or Vibration at LONDON ROAD, CREWE has been assessed and will be considered for inclusion in an appropriate future programme. At this stage, I am unable to give you any indication on timescale. In the meantime, we will continue to monitor the condition of this location via the scheduled inspection regime, and keep it in a safe condition for all highway users. |
Date issue closed: | |
Status: | f => 5: work finished |